General recommendations on mounting

1. Trays are installed into a trench on a concrete foundation. The thickness of the concrete base depends on the tray load class. Foundation is made of concrete mark B25. Lateral securing of trays is made in the shape of of slopes from the walls. The width of slopes depends on the class load.

The thickness of the concrete base and the width of slopes are provided in the installation diagrams.

2. Tray recess should be such that after mounting the upper lattice point was at 3-5 mm below the road surface.

3. Installation should be started from the installation of trashbox at the bottom of the track.

4. The channels are connected butt-coupled, rabbet into a slot. Sealant (010) or other bituminous mass is used as joint material.

5.In the case of angled compounding trays, trays and grilles must be cut and join.

6. If you are installing the trays in the asphalt surface, in the process of paving, grilles are advised to cover with strip of fiberboard or other material.

7.

Asphalting of the territory should be carried out when lattices are installed on the trays.

Do not run by pavers, cars on the tray without lattice.

8.With any coating expansion joints should be provided — in parallel to the drainage system at distance of 1.5-2 cm. each side, and perpendicularly at distance of 5 m. from one another.

9. Connection of trays to the sewer system is made through trash box using pipe with a diameter of 110 or 160 mm.

10. Connection of trays to the sewer system without trashbox is made through vertical tube, which is mounted on the bottom of the tray.

11. Conduct seasonal cleaning from dirt should be conducted periodically. To do this, remove lattice from trashbox and remove the bucket (088). The frequency of cleaning is determined by the operating conditions.

Standard range

Diagrams for concrete trays

Installation example of polymer trays of class А15-В125 into the asphalt concrete pavement
Installation example of polymer trays of class А15-С250 into the asphalt concrete pavement
Installation example of concrete trays of class А15-В125 at the edge of the curb
Installation example of polymer trays of class А15-С250 at the edge of the curb
Installation example of concrete trays into the surface of the asphalt concrete pavement and paving stone
Return to the list

Schemes for trays made of polymer concrete

Installation example of polymer trays of class А15-В125 into the surface of the asphalt concrete pavement and paving stone
Installation example of polymer trays of class А15-С250 into the surface of the asphalt concrete pavement and paving stone
Installation example of polymer trays of class А15-В125 at the edge of the curb
Installation example of polymer trays of class А15-С250 at the edge of the curb
Installation example of polymer trays into the surface of the asphalt concrete pavement and paving stone
Return to the list

Diagrams for plastic trays

Installation example of plastic trays of class А15-В125 into the seamless cement floor
Installation example of plastic trays of class А15-С250 into a monolithic coating
Installation example of polymer trays of class А15-В125 into the surface of the asphalt concrete pavement and paving stone
Installation example of polymer trays of class А15-С250 into the surface of the asphalt concrete pavement and paving stone
Installation example of polymer trays of class А15-В125 at the edge of the curb
Installation example of polymer trays of class А15-С250 at the edge of the curb
Installation example of polymer trays into the surface of the asphalt concrete pavement and paving stone
Return to the list

Diagrams for trash boxes and inlets

Installation example of concrete trash boxes of class А15-В125 into the surface of the asphalt concrete pavement and paving stone
Installation example of concrete trash boxes of class А15-С250 into the surface of the asphalt concrete pavement and paving stone
Installation example of polymeric concrete trash boxes of class А15-В125 into the surface of the asphalt concrete pavement and paving stone
Installation example of polymeric concrete trash boxes of class А15-С250 into the surface of the asphalt concrete pavement and paving stone
Installation example of plastic trash boxes of class А15-С250 into the surface of the asphalt concrete pavement and paving stone
Installation example of plastic inlets of class А15-С250 into the surface of the asphalt concrete pavement and paving stone
Return to the list

Inforced series:

Diagrams for concrete trays

Installation example of concrete trays of inforced series into the surface of the asphalt concrete pavement and paving stone
Example of cage reinforcement
Return to the list

Diagrams for polymeric concrete trays

Installation example of polymeric concrete trays of inforced series into the surface of the asphalt concrete pavement and paving stone
Installation example of polymeric concrete trays of inforced series at the edge of the curb
Return to the list

Diagrams for plastic trays

Installation example of plastic trays of inforced series into the surface of the asphalt concrete pavement and paving stone
Installation example of plastic trays of inforced series at the edge of the curb
Example of cage reinforcement
Return to the list

Diagrams for trash boxes and inlet wells

Installation example of trash boxes of inforced series into the surface of the asphalt concrete pavement and paving stone
Installation example of trash boxes of inforced series into the surface of the asphalt concrete pavement and paving stone
Installation example of trash boxes of inforced series into the surface of the asphalt concrete pavement and paving stone
Return to the list

Callback request

Your name and middle name*
Your phone*
Point of interest

Ask a question

Your name and middle name*
Your e-mail*
Your region*
Point of interest

Authorization

Login:
Password:
Remember Me
Forgot your password?
Login As
You can log in if you are registered at one of these services:
Livejournal
Yandex
Mail.Ru
Liveinternet
Blogger
OpenID